Project: MSBI – NAWARA CPF – South Tunisia Gas Development Project
Description: 420 Men Camp: Accommodation, Catering, Maintenance and all The Related Services.
Top Hospitality Services rental a 420 men Camp for the duration of the construction of the Nawara CPF
in the South of Tunisia. The camp includes the following buildings:
- Accommodation Cabins consisting of : 39 Labors Cabins, 15 Junior Cabins, 5 Senior Cabins, 2 VIP Cabins
- Kitchen compound consisting of: Kitchen with an area of 180m2, Dining Facilities of 216m2, Food Storage area of 108m2, Freezers area of 72m2
- Office Facilities with 25 offices and an area of 504 m2
- A training Center of 108m2
- A prayer Room of 108m2
- Recreation Facilities including: TV Rooms, Games Room, Gymnasium
Top Hospitality Services is operating and maintaining the camp during the duration of the project and is providing services such as:
- Water Supply
- Waste Management Services
- Power Generation
Top Hospitality Services Rental a second camp in Nawara for 250 men camp and is used as a residence for the different clients operating in the area. The camp includes the following buildings:
- Accommodation Cabins consisting of: 18 Labor Cabins, 16 Junior Cabins, 21 Senior Cabins
- Offices facilities with a total area of 288m2.
- Kitchen compound consisting of: Kitchen with an area of 72m2, Dining, Facilities of 150m2, Laundry Facilities, Food Storage area of 48m2, Freezers area of 36m2
Project: OMV – NAWARA CPF – South Tunisia Gas Development Project
Description: Accommodation and Catering for OMV Team
Project: JENEIN Nord field development Drilling Services awarded by ENI
Description: Rental of Fully accommodation Cabins and Office Cabins with Furniture
Project: Installation and Maintenance of The Tunisie Telecom Infrastructure
Description: Accommodation and Catering for Tunisie Telecom Team